1. Survey of Existing Diesel Generator Power Plants, location plan and land ownership status for Battery Solar Power Plants in the Diesel Generator Power Plant conversion program Stage I Batch III for 8 location in Southeast Sulawesi- Civil & Electrical
2. Site Investigation of Project Site for Renewstable Sumba Power Plant Project, East Sumba Regency, NTT Province - Survey,PT. Hexa Integra Electrica/ HDF Energy Indonesia
3. Site Investigation for Lembata, 1st and 2nd Adonara Solar Power Plants – Survey,PT PLN Enjiniring / PT PLN (Persero)
4. Survey and Licensing Assistance of 150 kV UGC from Muara Karang to Budi Kemuliaan,UIP JBB – PT PLN (Persero)
5. Preliminary Study of Buleleng 50 MW Solar Power Plants in Bali Province - Survey,PT PLN Enjiniring / PT Indonesia Power
6. Tower Assessment of 150 kV T/L Kenten to Tanjung Api-Api - Survey,PT PLN Enjiniring / PT PLN (Persero)
7. Topographic Survey and Soil Investigation Indramayu Outlet Substation 150 kV T/L, Indramayu 500 kV Substation, Indramayu 150 kV Substation, West Java Province.,PT PLN Enjiniring / PT PLN (Persero)
1. Review of Fesibility Study of Wado Hydroelectric Power Project, Sumedang, West Java - Civil
2. Topography Survey and Ground Penetrating Radar of 150 kV UGC from Bungah (JIIPE) to Manyar Gresik, East Java - Survey
3. Soil Investigation of 150 kV Transmission Line of Pakning – Siak Section 1, Riau Islands Province - Survey
4. Topography and Bathymetry Survey, Tangerang, Banten Province - Survey
5. Reconductoring Survey, Soil Investigation, Tower member measurements and Test Pit of 150 kV Transmission Line Ujung Berung Lama – Tx. Rancaekek – Sunyaragi, West Java Province – Survey
6. Ground Penetrating Radar of 500/150 kV Waru Substation (GIS)
7. Preliminary Geotechnical Study for Mahendra 1 & 2 Wind Power Plant – Civil
8. LKS Detail Ground Topography and Existing Road Survey Phase-1, Tangerang, Banten Province - Survey
9. Topography & Geotechnical Survey for Schematic & DED Infrastructure Engineering Paramount West Petals, Tangerang, Banten Province - Survey
1. Topography Survey and Geological Mapping of T.410 – T.420 Relocation 500 kV VHVTL Tasikmalaya – Depok - Sukabumi - Survey
2. Reroute T.5X – T.8X South Sumatera – 8 Mine Mouth Coal Fired Power Plant IPP Project 2X660 MW T/L, South Sumatera - Survey & Civil
3. Topo Precom Survey Work Cendana Cove ( + 5.17 Ha), Tangerang, Banten Province - Survey
4. Topography Survey and Soil Investigation for 150 kV Overhead T/L of Cirata Floating Photovoltaic and Extension 150 kV Cirata Substation, Purwakarta Regency, West Java – Survey
5. Preparation of Technical Requirement of TSF Dam Design Proposal, North Sumatera - Civil
6. Update of Sibundong & Lasolo HEP Feasibility Studies “Hydrology study and unit sizing scope”, North Sumatera and South East Sulawesi - Civil
7. Verification of Benchmarks using Geodetic GPS Measurement, Purwakarta Regency, West Java – Survey
8. Site Investigation of Engineering Consultancy Services of 500 MW Thorcon Thorium Power Plant, Bangka & Belitung - Survey
9. Site Investigation for Feasibility Study of Floating PV & Grid Impact Study (GIS), Batam Island, Riau Islands Province - Survey
1. Reconductoring Study (Tower) of Bandung Utara - Padalarang 150 kV Transmission Line and Kalibakal – Bumiayu 150 kV Transmission Line, West & Central Java - Civil
2. Uprating Study (Tower) of Jelok-Sanggrahan 150 kV Transmission Line, Central Java - Civil
3. Topography Survey and Soil Investigation of PLTMG Manokwari 150 kV Substation and Recheck of Soil Investigation of 150 kV T/L, West Papua - Survey
4. Topography Survey by Drone LIDAR of Batang Tuik MHEPP, West Sumatera - Survey
5. Pre-Feasibility Study of Cipeles MHEPP, Sumedang, West Java – Civil & ME
6. Site Visit INA-CBT di Kab. Pasangkayu, West Sulawesi - Survey
1. High Resolution Soil Resistivity Survey of Critical Tower T.46 Cirata - Cibatu 500 kV Transmission Line, West Java - Survey
2. Soil Resistivity of Blimbing Baru 150 KV Gas Insulated Substation (GIS), Malang, East Java - Survey
3. Site Investigation of Sulbagsel CFPP (2X200 MW) (Include Bathymetry & Hydro-Oceanography Survey and Thermodynamic Study), Konawe, South East Sulawesi – Survey and Civil
4. Route Survey (include GPR) of Sunter - Kemayoran S/S 150 kV Under Ground Cable (UGC), DKI Jakarta - Survey
5. Topography, Bathimetry Survey and Soil Investigation at Muaro Jambi, Jambi – Survey and Civil
6. Hydro-Oceanography Survey and Soil Investigation of 20 kV Distribution Line (Sub Sea cable) Labuan Bajo, Pulau Bajo, NTT – Survey and Civil
1.Cilegon - Banten - Site Investigation PLTU Suralaya - Reclaimed Area & Jetty
2.Luwuk - West Sulawesi - Site Investigation PLTGU Luwuk 150 MW
3.West Java - Detail Desain Pondasi Baru Tower 85 PLTM Cikopo 2 - Sumadra
4.West Java - SUTT 70 kV Sumadra - Pameungpeuk Tower 31 & Tower 35
5.West Java - SUTT 150 kV Sunyaragi - Rancaekek Tower 100, Tower 108 & Tower 149
6.West Java - SUTET 500 kV Cirata - Cibatu Tower 12, Tower 21 & Tower 41
7.West Java - SUTET 500 kV New Ujung Berung - Mandirancan Tower 108
8.West Java - SUTET 500 kV Bandung Selatan - Mandirancan Tower 150
9.Indramayu - West Java - Rekruitmen Personil untuk Pekerjaan Supervisi SUTET 500 kV Mandirancan - Indramayu
10.Pasaman - West Sumatera - 150 kV Transmission Line Study and System Study Pasaman HEPP Project
11.Muara Enim - South Sumatera - Route Survey South Sumatera - 8 Mine Mouth Coal Fired Power Plant IPP Project 2x660 MW Transmission Line 500 kV
12.Muara Enim - South Sumatera - Soil Investigation South Sumatera - 8 Mine Mouth Coal Fired Power Plant IPP Project 2x660 MW Transmission Line 500 kV
13.Muara Enim - South Sumatera - Tower and Civil Work South Sumatera - 8 Mine Mouth Coal Fired Power Plant IPP Project 2x660 MW Transmission Line 500 kV
1.Lombok - Provinsi NTB - Site Investigation for Feasibility Study on BMPP 30 MW
2.Ambon - Provinsi Maluku - Recheck Survey Topografi SUTT 150 kV Passo-Wayame
3.Jakarta Utara - Provinsi DKI Jakarta - Site Investigation for Feasibility Study on Sunter Waste to Energy
4.Provinsi Riau - Soil Improvement and Topography Study of Combined Cycle Power Plant Project 275 MW
5.Provinsi Kalimantan Tengah - Site Investigation for Feasibility Study Barge Mounted Power Plant
6.Jayapura - Provinsi Papua - Survey Topografi SUTT 150 kV GI Jayapura/Skyland-GI Angkasa,Survey dan Penyelidikan Tanah GI 150 kV Angkasa
7.Jayapura - Provinsi Papua - Soil Investigation SUTT 150 kV GI Jayapura/Skyland-GI Agkasa dan GI 150 kV Angkasa
8.Provinsi Jawa Barat - Survey Topografi Pekerjaan Konsultan Design Relokasi SUTET dan SUTT Yang Terdampak Proyek Kereta Cepat Jakarta-Bandung (Section 2)
9.Provinsi Jawa Barat - Penyelidikan Tanah Pekerjaan Konsultan Design Relokasi SUTET dan SUTT Yang Terdampak Proyek Kereta Cepat Jakarta-Bandung (Section 2)
10.Provinsi Jawa Barat - Survey Topografi dan Penyelidikan Tanah GI 150 kV Teluk Jambe (EXT), GI 150 kV Jatiluhur Baru, SUTT 150 kV Teluk Jambe II-Karawang, SUTT 150 kV Teluk Jambe–Teluk Jambe II
11.Maros - Provinsi Sulawesi Selatan - Site Investigation for Feasibility Study Barge Mounted Power Plant
12.Lahat - Provinsi Sumatera Selatan - Preliminary Survey dan Penyiapan BOQ Reroute 3 Jalur SUTT 150 kV
13.Kutai Timur - Provinsi Kalimantan Timur - Soil Investigasi Lokasi Desa Pelawan, Kecamatan Sangkulirang, Kabupaten Kutai Timur
14.Kutai Timur - Provinsi Kalimantan Timur - Survey Topografi dan Bathymetry Lokasi Desa Pelawan, Kecamatan Sangkulirang, Kabupaten Kutai Timur
15.Pongkeru - Provinsi Sulawesi Selatan - Indonesia Pongkeru HEPP Project
16.Provinsi Kalimantan Selatan - Pekerjaan Penyediaan Data Perapatan Titik Kontrol untuk Orthorektifikasi Wilayah Kalimantan Selatan dan Sekitarnya (KSO PT Daya Insan Cipta)
17.Garut - Provinsi Jawa Barat - Rekonduktoring 20 kV PLTM Cikopo-GI Sumadra
18.Provinsi DKI Jakarta - Survey Topografi PLTD Senayan 100 MW
19.Kutai Timur - Provinsi Kalimantan Timur - Prelimiary Soil Investigasi Lokasi Alternatif PKS PT HAL
1.Garut - Provinsi Jawa Barat - Review dan Detail Desain PLTM Cikaengan 3x1.7 MW
2.Provinsi Gorontalo - Survey Topografi, Bathymetry, dan Investigasi Geoteknik Dalam Rangka Supervisi Pengerukan Danau Limboto
3.Luwu Utara - Provinsi Sulawesi Selatan - Review and Detail Design of Baliase Mini Hydro Power Plant
4.Provinsi DKI Jakarta - Penyelidikan Tanah Pembangunan GI 150 kV Bandara Soetta dan Incomer serta Pembangunan GIS 150 kV Kembangan II
5.Pekanbaru - Provinsi Riau - Site Investigation for Feasibility Study of IPP Riau GFPP 250 MW
6.Samarinda - Provinsi Kalimantan Timur - DED Drainase Jalan Samarinda
7.Provinsi Kep Riau - Site Investigation of Scattered Gas Fired Power Plant (GFPP) Project
8.Sukabumi - Provinsi Jawa Barat - Jasa Konsultan Manajemen Konstruksi PLTM Kertamukti 3 X 2.1 MW
9.Subang - Provinsi Jawa Barat - Site Investigation for Pre Feasibility Study On CFPP 2 x 1,000 MW (Gross)
10.Sorong - Provinsi Papua Barat - Survey Topografi Gardu Induk dan Jalur Transmisi 150 kV
11.Sukabumi - Provinsi Jawa Barat - Pre Feasibility Study PLTM Nangela
12.Luwuk - Provinsi Sulawesi Tengah - Pekerjaan Site Investigation PLTMG Luwuk 40 MW
13.Tanjung Lesung - Provinsi Banten - Survey Jalur Transmisi SUTT 150 kV Tanjung Lesung, PLTU Labuhan, dan GI Tanjung
14.Provinsi Jawa Barat - Survey dan Penyelidikan Tanah SUTET 500 kV Ungaran-Mandirancan-Bandung Selatan Tower 168, 171, & 255
15.Provinsi Jawa Barat - Survey dan Penyelidikan Tanah GITET Delta Mas (Ext), GI 150 kV Tanggeung, Extension 2 LB GI 150 kV Pelabuhan Ratu/Jampang Kulon, GIS 150 kV Dayeuh Kolot dan Incomer
16.Provinsi Jawa Barat - Survey dan Penyelidikan Tanah GI 150 kV Sawangan, T/L 150 kV Delta Mas-Ganda Mekar, T/L 150 kV Delta Mas - KIIC 2
17.Pak Pak Barat - Provinsi Sumatera Utara - Investigasi Geoteknik PLTM ORDI 5
18.Tanjung Lesung - Provinsi Banten - Soil Investigation Jalur Transmisi SUTT 150 kV Tanjung Lesung-PLTU Labuhan, Ext GI Labuhan dan Ext GI Tanjung Lesung
19.Cianjur - Provinsi Jawa Barat - Investigasi Geoteknik untuk PLTM Kalapa Nunggal
20.Cilegon - Provinsi Banten - Site Investigation of FS for Suralaya USC CFPP 2X1,000 MW
21.Elektrikal| Kerinci - Provinsi Jambi - Study Kelistrikan PLTA Gunung Tujuh 2X7,85 MW
1.Cianjur - Provinsi Jawa Barat - Penyelidikan Geoteknik Menggunakan Handbore pada Saluran Pelimpah Headpond PLTM Cibalapulang 1
2.Garut - Provinsi Jawa Barat - Review Engineering Desain Bangunan Water Way PLTM Cilaki 1B (3x.3.230 kW)
3.Ulubelu - Provinsi Lampung - Test Sondir Rencana Tapak Tower PLTP Ulubelu Unit 3 dan 4 Geothermal
4.Geodesi[ Solok - Provinsi Sumatera Barat - Citra Satelit PLTM Gumanti
5.Tomata - Provinsi Sulawesi Tengah - Investigasi Geoteknik PLTM Tomata
6.Balikpapan - Provinsi Kalimantan Timur - DED Embung Aji Raden Kota Balikpapan
7.Provinsi Sumatera Barat - Review Analisa Hidrologi PLTM Sangir Hulu 2X5 MW
8.Provinsi Gorontalo - Site Investigation Untuk Studi Kelayakan IPP Pembangkit Listrik Tenaga UAP Molotabu Expansion (2x50 MW)
9.Rejang Lebong - Provinsi Bengkulu - Study Penyambungan Pembangkit Listrik PLTM Klaai (2,6 MW)
10.Rejang Lebong - Provinsi Bengkulu - Study Penyambungan Pembangkit Listrik PLTM Simpang (3 MW)
11.Rejang Lebong - Provinsi Bengkulu - Jasa Konsultan Pekerjaan Study Topografi PLTM Klaai (2x1.3 MW)
12.Rejang Lebong - Provinsi Bengkulu - Jasa Konsultan Pekerjaan Study Topografi PLTM Simpang (2x1.5 MW)
13.Samarinda - Provinsi Kalimantan Timur - DED Jalan Kota Samarinda Utara
14.Bone Bolango - Provinsi Gorontalo - DED dan Model Test Bendungan Bone Hulu
15.Provinsi Jawa Barat - Survey dan Penyelidikan Tanah Feasibility Study Pembangunan Transmisi Sepanjang 46 KM PLTP Tangkuban Parahu Menuju GI Subang 150 kV
16.Provinsi Jawa Barat - Survey dan Soil Inestigasi dalam Rangka Penyiapan Dokumen Lelang Transmisi dan Gardu Induk Tersebar Tahun 2014
17.Rejang Lebong - Provinsi Bengkulu - Soil Investigasi PLTM Simpang
18.Rejang Lebong - Provinsi Bengkulu - Soil Investigasi PLTM Klaai
19.Garut - Provinsi Jawa Barat - Survey Geolistrik 2D pada Rencana PLTM Pasir Hanjuang
20.Wonosobo - Provinsi Jawa Tengah - Investigasi Geoteknik pada Rencana PLTM Wonokromo (Kemiri II)
21.Provinsi Sulawesi Selatan - Survey Topografi Bendungan Kalola dan Salamekko
22.Garut - Provinsi Jawa Barat - Due Dilligence PLTM Cikaengan 3X2,4 MW
23.Sukabumi - Provinsi Jawa Barat - Jasa Penyusunan Dokumen Tender PLTM Kertamukti 3X2,1 MW
24.Pasuruan - Provinsi Jawa Timur - Site Investigation for FS Grati Add On Blok II 150 MW
25.Semarang - Provinsi Jawa Tengah - Site Investigation for FS New Combine Cycle Power Plant Tambak Lorok
26.Surabaya - Provinsi Jawa Timur - Site Investigation for FS of New Combine Cycle Power Plant Perak
27.Bau Bau - Provinsi Sulawesi Tenggara - Site Investigation PLTU Bau Bau 2X25 MW
1.Bekasi - Provinsi Jawa Barat - DED Drainase Kabupaten Bekasi
2.Sumba Timur - Provinsi NTT - Pengukuran Topografi PLTM Harunda 2X0.75 MW
3.Cianjur - Provinsi Jawa Barat - Investigasi Geoteknik PLTM Cibalapulang 2 (2X3.25MW) dan Cibalapulang 3 (2X3MW)
4.Provinsi Sumatera Barat - Survey Topografi, Pekerjaan Penyelidikan Geoteknik dan DED Pembangunan PLTM Induring
5.Provinsi Sumatera Barat - Investigasi Geoteknik PLTM Induring
6.Provinsi Jawa Barat - Study Kelayakan Pembangkit Listrik Tenaga Minihidro (PLTM)
7.Sorong - Provinsi Papua Barat - Pemetaan Topografi Metode UAV (Unmanned Aerial Vehicle) di WIUP PT. Megapura Prima Industri
8.Provinsi Jawa Barat - Survey Geolistrik 2D Jalan Akses PLTA Upper Cisokan
9.Deli Serdang - Provinsi Sumatera Utara - DED Penyempurnaan Pekerjaan Civil Sisi Udara Bandara Kualanamu
10.Provinsi Nangroe Aceh Darussalam - Site Investigation For Feasibility Study Of Coal Fired Power Plant
11.Sukabumi - Provinsi Jawa Barat - Investigasi Geoteknik PLTM Citarik
12.Cianjur - Provinsi Jawa Barat - Pemboran Geoteknik PLTM Cibalapulang 1 Lokasi headpond & Penstock
13.Nias - Provinsi Sumatera Utara - Perencanaan Kawasan Pemanfaatan Pangkalan Pendaratan Ikan (PPI) Teluk Belukar Gunung Sitoli
14.Cianjur - Provinsi Jawa Barat - Investigasi Geologi dengan Survey Geolistrik 2D di Lokasi PLTM Cibalapulang 1
15.Lebak - Provinsi Banten - Due Diligent Proyek PLTM Desa Situmulya, Kec. Cibeber, Kab. Lebak Banten
16.Pak Pak Barat - Provinsi Sumatera Utara - Investigasi Geoteknik PLTM Ordi
17.Humbang Hasundutan - Provinsi Sumatera Utara - Investigasi Geologi dengan Survey Geolistrik 2D di Lokasi PLTM Sisira
18.Cianjur - Provinsi Jawa Barat - Investigasi Geoteknik PLTM Cibalapulang 1 lokasi Headpond Baru
19.Kaur - Provinsi Bengkulu - Investigasi Geologi dengan Survey Geolistrik 2D di Lokasi PLTM Padang Guci
1.Provinsi Kalimantan Barat- Jasa Konsultansi Kelayakan Pos Lintas Batas Negara Jagoi Babang di Kab. Bengkayang
2.Pak Pak Barat - Provinsi Sumatera Utara- Soil Investigasi Untuk DED PLTM Lae Kombih 3 (2 x 4 MW)
3.Provinsi Bengkulu- Fotogrametri PLTM Kinal
4.Provinsi Sumatera Barat- Pembuatan Basic Desan, Penyusunan Dokumen Tender dan RKS PLTM Muara Sako 2 x 1,5 MW Kab. Pesisir Selatan
5.Provinsi Sumatera Barat- Pembuatan Gambar Desain Dasar Sipil & RAB PLTM Induring 2 x 1,0 MW
6.Nias - Provinsi Sumatera Utara- Pradesain Pelabuhan Penyeberangan di Nias Selatan Lintas P.Tanah Bala-P.Tanah Masa
7.Bengkalis - Provinsi Riau- FS Jembatan Pulau Bengkalis-Pulau Sumatera
8.Provinsi Lampung- Pekerjaan Pengukuran Topografi PLTA Besai 2
9.Cianjur - Provinsi Jawa Barat- Pekerjaan Boring pada Lokasi Headpond dan Anchor Block Penstock Proyek Pembangunan PLTM Cibalapulang
10.Provinsi Sumatera Barat- Penyelidikan Geoteknik Pembangkit Listrik Tenaga Minihidro (PLTM) Kerambil kapasitas 2 x 1.5 MW
11.Provinsi Kalimantan Timur- Soil Investigasi dan Mekanika Tanah untuk Detail Engineering Design (DED) Pos Lintas Batas Sungai Pancang Sebatik
1.Provinsi Sumatera Barat - Review FS dan DED PLTM Gumanti III
2.Provinsi Sumatera Barat - Penyelidikan Geoteknik untuk pembangunan PLTM Gumanti III
3.Provinsi Jawa Barat - Survey Terpadu di 3 Lokasi Prioritas Panas Bumi Jawa Barat (Cibalong-Cigunung, Cilayu, Dan Jampang)
4.Provinsi NTB - Survey dan Soil Investigasi SUTT 150 kV PLTP Sembalun-Pringgabaya dan GI Tanjung-PLTP Sembalun
5.Provinsi NTB - Survey dan Soil Investigasi SUTT 150 kV GI Labuhan-Empang-Dompu
6.Provinsi Nangroe Aceh Darussalam - Review Desain PLTM Mangku Sosial 2 x 3,0 MW
7.Provinsi Sumatera Barat - Pembuatan Basic Desan, Penyusunan Dokumen Tender dan RKS PLTM Kerambil 2 x 1,5 MW Kab. Pesisir Selatan
1.Provinsi Sumatera Selatan - Survey Geolistrik dan Geohidrologi di Area Tambang Pabrik Baturaja